399 Park Ave.
Techmenity was brought in by Restrepo Innovations to support the technology installation for a Class A commercial space at 399 Park Ave. In this project, we were not the lead technology partner — instead, we served as a specialized subcontractor responsible for security installation, structured cabling, and telecom room build-out in coordination with the AV integrator and the building’s security contractor.
This project demonstrates Techmenity’s ability to integrate seamlessly into larger project teams and deliver high-quality work within established scopes, communication channels, and protocols.
Key Objectives
-
Deliver a clean, reliable structured cabling infrastructure to support AV and IT systems
-
Install security devices in coordination with the building’s existing security contractor
-
Build out the telecom room to support the tenant’s operational needs
-
Maintain alignment with construction management, electrical, and low-voltage partners
-
Serve as an accountable, communicative team player within a complex project ecosystem
What We Delivered
Structured Cabling Infrastructure
-
Data cabling to support AV systems, tenant IT equipment, and future expansion
-
Clean cable management and labeling for long-term serviceability
-
Coordination with AV vendor to ensure all pathways, terminations, and drops met spec
Security Installation
-
Installed security devices (cameras, readers, etc.) per building standards
-
Worked directly with the building’s security contractor for device locations, system tie-ins, and compliance
-
Ensured cable paths and device placements aligned with base-building requirements
Telecom Room Build-Out
-
Rack installation, patch panels, and cable routing
-
Power and cooling coordination with MEP and construction management
-
Set up the infrastructure required for the AV contractor and tenant’s IT team
Collaboration & Team Integration
This project highlights Techmenity’s ability to operate effectively in a subcontractor role:
-
Brought in by Restrepo Innovations as a trusted installation partner
-
Followed construction management processes and reporting structures
-
Coordinated seamlessly with:
-
AV integrator
-
Building security firm
-
Electrical contractor
-
Construction management team
-
-
Showed flexibility by aligning with existing workflows rather than imposing our own
-
Delivered on time, with clear communication and zero disruptions to other trades
This case study is a strong example of our ability to “play well with others” — leading when needed, supporting when appropriate, and always delivering quality work.
Outcomes
-
Fully commissioned cabling and security infrastructure ready for AV/IT deployment
-
Telecom room built to Class A standards with clean layout and clear labeling
-
Smooth handoff to the AV team and building security
-
Positive feedback from the construction manager and the partner who brought us in
-
Reinforced Techmenity’s reputation as a dependable partner in both lead and supporting roles
