Techmenity served as the local project manager for Aerwave, on Brookfield Properties’ new Third at Bankside development from January 2021 through project completion in August 2023. The 4.3-acre mixed-use riverside project in the Mott Haven neighborhood of The Bronx features private and public amenities including on-site parking, health and wellness facilities, shared lounges, rooftop terraces, retail units, and a tech-focused community center. 

Copy of IMG_1554-1
Copy of IMG_1557-1

Project Scope

Techmenity was responsible for:

1. Managing the RFP process to hire low voltage cabling contractors for Phase 1, "Third at Bankside."

2. Installation of vertical fiber-optic cabling through 3 towers (17, 25, and 25 stories tall)

3. Installation of horizontal copper cabling into 455 residential units, hallways, common areas, and outdoor areas.

4. Installation of 550 WiFi access points

5. Installation of 27 IDF closets which included:
     - Locking vertical enclosures
     - Network switches
     - Fiber termination boxes
     - Power distribution units  

6. Assisting with network turn-up and switch configurations

7. Buildout of one MDF and coordination of Crown Castle and Verizon’s fiber option feeds into the MDF from the street

8. Attending weekly construction meetings and liaised with the developer, GC, and MEP, as well as electrical, carpentry and other trades.

All three towers at 2401 Third are now fully occupied and Phase 2 construction is now complete at 101 Lincoln, adding another 900+ housing units across four connected towers similarly propped up on a multi-floor base. 

Screen Shot 2021-10-01 at 5.38.47 PM

Architect: Hill West Architects
Interior Design: Whitehall Interiors & Leong Leong
Landscape Design: MPFP
WiFi: Aerwave
Tech Project Management & Installation: Techmenity
Community Center Technology: Project Destined

assessing the IDF closet
Copy of IMG_1553-1

Our Senior TechGC, Lou Scavelli assessing the IDF closet and pointing out a WiFi access point by the outdoor pool. Property-wide WiFi @Aerwave

Screen Shot 2021-10-01 at 5.38.13 PM
Screen Shot 2021-10-01 at 5.38.32 PM

Phase 1 at 2401 Third Avenue (left),  Third Avenue Bridge (center) and Phase 2 at 101 Lincoln (right) | Brookfield Properties | Hill West

Screen Shot 2021-10-01 at 5.39.55 PM
Screen Shot 2021-10-01 at 5.39.04 PM
Screen Shot 2021-10-01 at 5.39.32 PM